New Road 68 or Broadmoor home
200 amp service, full panel, one garage outlet. Usually a straightforward circuit, sometimes a small sub panel.
Pasco is the fastest-growing city in the Tri-Cities, and a lot of the newer homes along Road 68 and out into Broadmoor were built with 200 amp services and a garage that was never wired for a car. A Level 2 charger is a 240 volt circuit, a load calculation, an L&I permit and an inspection. We handle all of it and give you a written price before we start.
200 amp service, full panel, one garage outlet. Usually a straightforward circuit, sometimes a small sub panel.
Smaller service and unknown additions. We run the load calculation before promising a charger circuit.
Charging through an extension cord is a fire risk and prohibited by every EV maker. It needs a real circuit.
The subdivisions along Road 68, Broadmoor, Chapel Hill and West Pasco went up quickly with production wiring. Most have 200 amp services. Most also have panels packed with small circuits and a garage with one outlet. A charger install there is a 40 to 60 amp circuit from the panel to the garage wall, and if the panel has no open spaces, a small sub panel to make room. The service itself almost never needs to change.
East Pasco and the older core near downtown run older, with smaller services and additions wired by whoever was available at the time. Before we put a 32 or 40 amp continuous load on one of those panels, we run the load calculation under NEC 220.83 or 220.87. If the numbers do not work, you hear that before the quote, not after the install.
Electrical permits in Pasco go through Washington Labor and Industries, and an L&I inspector signs off on the work. We pull the permit and meet the inspector. Your power stays on for a normal charger install. Pasco is Franklin PUD territory, and the only time the utility gets involved is a service upgrade, where we coordinate the meter work with Franklin PUD rather than the Benton County utilities.
A 40 amp breaker gives you 32 amps of charging, which adds roughly 25 to 30 miles of range an hour and refills a normal Pasco commute overnight with time to spare. A 60 amp circuit for 48 amp charging makes sense for a big battery, a long daily drive, or two vehicles sharing one charger. We size to your driving, not to the biggest number on the box, and we say so if the smaller circuit is the right call.
We work all over Pasco, from the older neighborhoods to the newest subdivisions. These are the areas we are in most weeks. If yours is not listed, call anyway. If it is in Franklin County, we cover it.
We record the service size, existing loads and available spaces, then run the calculation under NEC 220.83 or NEC 220.87.
Charger amperage, breaker size and conductor size get chosen as one set, based on what the service supports and how you actually drive.
We pull the permit, run the circuit from the panel to the charger location in conduit or cable as the route requires, and mount the unit.
The charger is set to the correct amperage, tested with your vehicle plugged in, and we are on site for the inspection.

Tesla Wall Connector installation in the Tri-Cities. Hardwired 48A circuits, load calculations, permits, commiss
See details
Out of breaker space for a heat pump, shop, or EV charger? Gale Electric upgrades residential panels across the
See details
Moving from 100 to 200 amps for a heat pump, shop, or EV charger? Gale Electric handles the load calculation, pe