New Builds

Wired Right From The First Stud

Wiring a house is three visits spread across the build, and the middle one decides how the home lives for the next thirty years. Once insulation and drywall go up, every change gets expensive. We walk the framed house with you before rough-in, mark every device, and put the circuits where your life actually happens instead of where a plan set defaulted them.

5.0 on Google (71) WA Lic. GALEEEL790O7 Free estimates Permitted and inspected
Know the signs

Signs it is time to bring in your electrician

The slab is going in

Conduit under a driveway or a slab has to be placed before the pour. Afterward the options get expensive fast.

You need temporary power

Framers and other trades need a temp pole and a permitted service before they can run tools on site.

Framing is nearly done

Rough-in follows framing, plumbing, and HVAC. This is the window to walk the house and mark every device.

Your plans show default outlets

Plan sets place the code minimum. Where you will actually put a desk, a TV, or a treadmill is not on that drawing.

An EV or shop planned

A conduit and a panel space reserved during the build costs a fraction of adding them after the drywall is up.

The three stages of wiring a house

First comes temporary power, a permitted service on a pole or the meter base, so the other trades have something to plug into. Second is rough-in, which happens after framing, plumbing, and HVAC are in and before insulation and drywall. Everything structural to the electrical system goes in during rough-in, meaning the panel, every home run, every box, every can light, the low voltage, and the smoke alarm interconnect. A rough-in inspection follows with the walls still open.

Third is trim, which happens after paint. Devices, plates, fixtures, and the panel schedule all get finished, appliances get connected, and the system gets tested circuit by circuit before the final inspection. The build's critical path runs through rough-in more than the other two, because insulation and drywall cannot start until it passes. We schedule around that, and we do not leave a builder waiting on us to close in a house.

The walkthrough that makes the difference

A plan set gives you the code minimum layout, which is a starting point and not a design. Before rough-in we walk the framed house with the homeowner and mark the walls with a marker. Where does the bed actually go, and does the nightstand have an outlet on the right side. Which wall gets the television, and should that box be recessed with conduit behind it. Is the switch on the correct side of the door once it swings.

That hour catches the things nobody thinks about until it is too late to change. Exterior outlets on the patio and near the front for holiday lighting. A dedicated circuit in the garage for a freezer or a compressor. Enough switching that you are not crossing a dark room. A conduit stub to the future shop. Cans laid out to the furniture plan rather than centered on the room. All of it is free to decide now and costly to add later.

Service size, panel location, and the utility

Two hundred amps is the practical default for new homes in Benton and Franklin County, and the actual number comes from a load calculation under NEC Article 220. Heat pump, air handler with backup heat strips, range, dryer, water heater, and hot tub add up faster than people expect, and adding an EV charger and a shop feed to that list can push a house past a 200 amp service. Better to run the calculation before the meter base is set.

Panel and meter placement are worth deliberate thought too. The meter goes where Benton PUD or Franklin PUD can serve it and read it, which drives the point of attachment and sometimes the trench route from the transformer. The panel itself wants to be somewhere you can reach it in the dark, with the clear working space the code requires kept clear permanently, not blocked by shelving in year two. We coordinate the utility side so nothing has to move after the wall is finished.

Keeping the build on schedule

Two inspections apply to a new home, a rough-in with the walls open and a final before occupancy. In most of Benton and Franklin County the permit and both inspections go through Washington Labor and Industries, while the City of Richland runs its own electrical inspection program inside city limits, so the process depends on where you are building. We pull the permit, request the inspections, and meet the inspector rather than handing that to the builder.

The rest is showing up. Rough-in is a two to four day job on a typical single-family home, longer on larger or more complex plans, and the insulator cannot start until we pass. Kyle runs a small family company, which means the person who quoted the job is the person on site, and the schedule you get is one we can actually keep. Builders and homeowners both tend to notice that more than anything else.

How the job runs

From first call to final inspection

1

Temporary power

We set and permit the temp service so framing and the other trades have power on site from the start.

2

Plan review and walkthrough

Load calculation, service sizing, then a walk of the framed house marking every device, switch, and fixture location with you.

3

Rough-in

Panel set, home runs pulled, boxes and cans placed, low voltage and smoke alarm interconnect run, then rough-in inspection.

4

Trim and final

Devices, fixtures, and appliance connections after paint, panel labeled, every circuit tested, final inspection before occupancy.

FAQ

About new construction wiring

How long does rough-in take on a new house?
Two to four days for a typical single-family home, longer for larger plans, vaulted framing, or extensive lighting. It has to be complete and inspected before insulation, so it sits on the build's critical path. We schedule it as a block rather than in pieces, and we confirm the date with the builder so nobody is stacked on top of anyone else.
Who handles the permit and the inspections?
We do. We pull the electrical permit, request both the rough-in and the final inspection, and meet the inspector at each one. Depending on the jurisdiction that runs through Washington L and I or, inside Richland city limits, through the city's own electrical inspection program. The builder does not have to chase any of it.
Should I add wiring for an EV charger now?
Yes, at least the conduit and the panel space. Running a raceway to the garage wall during the build is inexpensive because the walls are open. Doing it later means fishing walls, cutting drywall, or surface conduit. Even if you do not own an electric vehicle, a reserved space and a conduit path make it a one hour job in the future instead of a project.
Can I change the outlet locations after rough-in?
Yes, but only easily before drywall goes up. Once the walls are closed, changes mean cutting, patching, texture, and paint, and the cost climbs quickly. That is exactly why we do the walkthrough with a marker before anything gets pulled. Moving a box during rough-in takes a few minutes. Moving it after the house is finished takes three trades and a repaint.
Do you work directly with builders or with homeowners?
Both. On a spec or production build we work to the builder's schedule and plan set. On a custom home we work with the homeowner directly on the walkthrough and the selections, then coordinate the timing with the general contractor. Either way the same licensed electrician who quoted the job is the one on site doing it.
Free estimate

Get a straight answer and a price before we start.

Free estimates across the Tri-Cities. Call Kyle and the crew, or send the details and we will come look.

5.0 on Google (71 reviews) BBB accredited, A+ WA license GALEEEL790O7 Military discount
Call nowFree estimate